TRANSIT BUS RAMP over HARRISON STREET

TO I80 EAST · County 075, California · Built 2018 · 1 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34C0087L
Year Built
2018
Length
26.9 m (88.3 ft)
Max Span
25.7 m
Width
7.6 m (24.9 ft)
Lanes
1
Daily Traffic
1,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.