WB80-FREMONT ST over ESX HARR CLEM FOLSOM 1ST

04-SF-080-5.62R-SF · County 075, California · Built 2008 · 2 Lanes · 27,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34 0127S
Year Built
2008
Length
549.6 m (1803.1 ft)
Max Span
40.5 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
27,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.