TERMINAL BUS RAMP over HOWARD STREET

JSO TERMINAL BUILDING · County 075, California · Built 2018 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34C0086
Year Built
2018
Length
318.4 m (1044.6 ft)
Max Span
57.6 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.