ARCH AIRPORT ROAD over FRENCH CAMP SLOUGH

0.34 MI EAST OF ROUTE 5 · County 077, California · Built 2013 · 4 Lanes · 20,818 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
29C0452
Year Built
2013
Length
46.9 m (153.9 ft)
Max Span
46.9 m
Width
41 m (134.5 ft)
Lanes
4
Daily Traffic
20,818
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.