INTERSTATE 5 SB over FRENCH CAMP ROAD

10-SJ-005-R22.51 · County 077, California · Built 1971 · 4 Lanes · 87,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0220L
Year Built
1971
Reconstructed
2015
Length
48.2 m (158.1 ft)
Max Span
23.8 m
Width
22.1 m (72.5 ft)
Lanes
4
Daily Traffic
87,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.