EL DORADO STREET over FRENCH CAMP SLOUGH

0.3 MI N FRENCH CAMP RD · County 077, California · Built 1958 · 4 Lanes · 4,924 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
29C0124
Year Built
1958
Length
40.5 m (132.9 ft)
Max Span
6.1 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
4,924
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.