BAYFRONT BLVD over REFUGIO CREEK

AT JOHN MUIR PKWY · County 013, California · Built 2020 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28C0521
Year Built
2020
Length
51.8 m (169.9 ft)
Max Span
25.1 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.