W4-W80 CONNECTOR over BNSF WILLOW SYCAMORE

04-CC-004-0.01-HER · County 013, California · Built 1983 · 2 Lanes · 20,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0143F
Year Built
1983
Length
178.8 m (586.6 ft)
Max Span
53.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
20,700
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.