SAN PABLO AVE over BNSF RY AND AMTRAK

WEST OF CAROL LANE · County 013, California · Built 1938 · 4 Lanes · 10,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
28C0062
Year Built
1938
Length
129.5 m (424.9 ft)
Max Span
10.4 m
Width
18.7 m (61.4 ft)
Lanes
4
Daily Traffic
10,300
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,570,000
Total Project Cost
$9,358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.