WATERFRONT RD over PACHECO SLOUGH
0.3 MI WEST SOLANO WAY · County 013, California · Built 1948 · 2 Lanes · 2,409 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.031606, -122.080631
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 78 years old.
Nearby Bridges
WATERFRONT RD over UP RR BNSF RY & AMTRAK
Built 1978
WATERFRONT RD over PEYTON SLOUGH
Built 1955
INTERSTATE 680 over ARTHUR ROAD
Built 1962
INTERSTATE 680 over SOUTH MOCOCO DRAIN
Built 1962
WATERFRONT-N680 ON over MARSH WETLANDS
Built 2006
INTERSTATE 680 NB over UPRR MARINA VISTA MOCOCO
Built 2006
N680-PACHECO OFFRP over INTERSTATE ROUTE 680
Built 1962
INTERSTATE 680 SB over UPRR MARINA VISTA MOCOCO
Built 1962
INTERSTATE 680 over E MARTINEZ DRAIN
Built 1962
PACHECO BLVD over E MARTINEZ DRAIN
Built 1962
Bridge Details
- Structure #
- 28C0006
- Year Built
- 1948
- Reconstructed
- 1965
- Length
- 229.5 m (753 ft)
- Max Span
- 26.9 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,409
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,490,000
- Total Project Cost
- $9,223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.