STATE ROUTE 4 WB over SAND CREEK ROAD

04-CC-004-M34.50 · County 013, California · Built 2014 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0381L
Year Built
2014
Length
61.8 m (202.8 ft)
Max Span
34 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
10,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.