STATE ROUTE 4 WB over SAND CREEK

04-CC-004-M34.40 · County 013, California · Built 2003 · 3 Lanes · 23,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
28 0372L
Year Built
2003
Reconstructed
2014
Length
26.8 m (87.9 ft)
Max Span
26.8 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
23,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.