STATE ROUTE 4 EB over SAND CREEK
04-CC-004-M34.40 · County 013, California · Built 2013 · 3 Lanes · 7,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.947147, -121.743778
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 13 years old.
Nearby Bridges
STATE ROUTE 4 WB over SAND CREEK
Built 2003
STATE ROUTE 4 EB over SAND CREEK ROAD
Built 2013
STATE ROUTE 4 WB over SAND CREEK ROAD
Built 2014
SHADY WILLOW LANE over SAND CREEK
Built 2007
STATE ROUTE 4 EB over SAN JOSE AVENUE
Built 2013
STATE ROUTE 4 over SAN JOSE AVENUE
Built 2003
STATE ROUTE 4 EB over LONE TREE WAY
Built 2013
STATE ROUTE 4 WB over LONE TREE WAY
Built 2008
FAIRVIEW AVENUE over SAND CREEK
Built 1966
STATE ROUTE 4 over DEER CREEK
Built 2018
Bridge Details
- Structure #
- 28 0372R
- Year Built
- 2013
- Length
- 25.8 m (84.6 ft)
- Max Span
- 24.2 m
- Width
- 23 m (75.5 ft)
- Lanes
- 3
- Daily Traffic
- 7,700
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.