EL CURTOLA BLVD over STATE ROUTE 24 & BARTD
04-CC-024-R8.27 · County 013, California · Built 1971 · 2 Lanes · 3,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.897797, -122.084972
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
STATE ROUTE 24 WB over WALNUT CREEK UC (BARTD)
Built 1970
OLD TUNNEL RD over RELIEZ CREEK
Built 1971
SR 24 EB over PLEASANT HILL ROAD
Built 1971
SR 24 WB RAMP over PLEASANT HILL ROAD
Built 1970
SR 24 EB RAMP over PLEASANT HILL ROAD
Built 1971
SR 24 WB over PLEASANT HILL ROAD
Built 1970
N680-W24 CONNECTOR over OLYMPIC BLVD I-680
Built 1998
S680-W24 CONNECTOR over N680-W24 CAMINO DIABLO
Built 1997
E24-PLEASANT HILL over MOUNT DIABLO BOULEVARD
Built 1971
E24-S680 CONNECTOR over BOULEVARD WAY
Built 1994
Bridge Details
- Structure #
- 28 0125
- Year Built
- 1971
- Length
- 118.3 m (388.1 ft)
- Max Span
- 59.1 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.