E24-PLEASANT HILL over MOUNT DIABLO BOULEVARD

04-CC-024-R7.60-LFYT · County 013, California · Built 1971 · 1 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0045S
Year Built
1971
Length
69.2 m (227 ft)
Max Span
27.4 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
3,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.