S680-W24 CONNECTOR over N680-W24 CAMINO DIABLO
04-CC-680-14.40-WLC · County 013, California · Built 1997 · 3 Lanes · 65,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.896642, -122.073497
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 29 years old.
Nearby Bridges
N680-W24 CONNECTOR over OLYMPIC BLVD I-680
Built 1998
E24-S680 CONNECTOR over BOULEVARD WAY
Built 1994
INTERSTATE 680 SB over MT DIABLO BOULEVARD
Built 1995
INTERSTATE 680 NB over MT DIABLO BOULEVARD
Built 1998
OAKVALE ROAD over INTERSTATE 680
Built 1997
OAKLAND BOULEVARD over N680&E24-YGNACIO OFF RMP
Built 1997
INTERSTATE 680 over OLYMPIC BOULEVARD
Built 1994
S680-OLYMPIC OFFRP over E24-S680 CONNECTOR RAMP
Built 1999
E24/N680 CONNECTOR over N680/W24 CONN I-680 C.D.
Built 1998
OLYMPIC BLVD over LAS TRAMPAS CREEK
Built 1963
Bridge Details
- Structure #
- 28 0126F
- Year Built
- 1997
- Length
- 320 m (1049.9 ft)
- Max Span
- 57 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 3
- Daily Traffic
- 65,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,344,000
- Total Project Cost
- $8,977,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.