S680-W24 CONNECTOR over N680-W24 CAMINO DIABLO

04-CC-680-14.40-WLC · County 013, California · Built 1997 · 3 Lanes · 65,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
28 0126F
Year Built
1997
Length
320 m (1049.9 ft)
Max Span
57 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
65,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,344,000
Total Project Cost
$8,977,000