HOOD-FRANKLIN ROAD over BEACH LAKE CANAL
0.6 MI. E OF SR 160 · County 067, California · Built 1993 · 2 Lanes · 6,767 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.365508, -121.509925
This bridge is in worse condition than 21% of bridges in County 067. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
HOOD-FRANKLIN RD over STONE LAKE CANAL
Built 1956
INTERSTATE 5 NB over STONE LAKE CREEK
Built 1975
INTERSTATE 5 SB over STONE LAKE CREEK
Built 1975
HOOD-FRANKLIN ROAD over INTERSTATE 5
Built 1975
INTERSTATE 5 over MIDDLE REACH STONE LAKE
Built 1975
INTERSTATE 5 over STONE LAKE
Built 1975
INTERSTATE 5 over SOUTH REACH STONE LAKE
Built 1975
FRANKLIN BLVD over STONE LAKE DRAIN
Built 1925
LAMBERT ROAD over STONE LAKE DRAIN
Built 1995
FRANKLIN BLVD over DRAINAGE DITCH
Built 1933
Bridge Details
- Structure #
- 24C0513
- Year Built
- 1993
- Length
- 55.6 m (182.4 ft)
- Max Span
- 15.8 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 6,767
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.