HOOD-FRANKLIN ROAD over INTERSTATE 5

03-SAC-005-8.49 · County 067, California · Built 1975 · 2 Lanes · 5,560 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
24 0326
Year Built
1975
Length
72.2 m (236.9 ft)
Max Span
35.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,560
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.