HOOD-FRANKLIN ROAD over INTERSTATE 5
03-SAC-005-8.49 · County 067, California · Built 1975 · 2 Lanes · 5,560 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.375394, -121.476614
This bridge is in worse condition than 61.5% of bridges in County 067. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
INTERSTATE 5 over MIDDLE REACH STONE LAKE
Built 1975
INTERSTATE 5 SB over STONE LAKE CREEK
Built 1975
INTERSTATE 5 NB over STONE LAKE CREEK
Built 1975
HOOD-FRANKLIN RD over STONE LAKE CANAL
Built 1956
INTERSTATE 5 over STONE LAKE
Built 1975
FRANKLIN BLVD over DRAINAGE DITCH
Built 1933
FRANKLIN BLVD over DRAINAGE DTCH (FRANKLIN)
Built 2008
FRANKLIN BLVD over STONE LAKE DRAIN
Built 1925
WILLARD PKWY over E FRANKLIN GAP CHANNEL
Built 2004
FRANKLIN BLVD over STONE LAKE DRAIN
Built 1933
Bridge Details
- Structure #
- 24 0326
- Year Built
- 1975
- Length
- 72.2 m (236.9 ft)
- Max Span
- 35.8 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,560
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.