TRIBUTARY CROSSING over FOLSOM SOUTH CANAL

100 N/O TRIBUTARY PT DR · County 067, California · Built 1995 · 2 Lanes · 4,812 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24C0498
Year Built
1995
Length
36.6 m (120.1 ft)
Max Span
35 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,812
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.