US HIGHWAY 50 over ALDER CREEK

03-SAC-050-16.46 · County 067, California · Built 1948 · 8 Lanes · 115,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
24 0033
Year Built
1948
Reconstructed
1954
Length
7.4 m (24.3 ft)
Max Span
3 m
Width
33.5 m (109.9 ft)
Lanes
8
Daily Traffic
115,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.