65TH ST EXPWY NB over MORRISON CREEK

0.1 MI S OF LEMON HILL · County 067, California · Built 1974 · 2 Lanes · 9,628 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24C0204R
Year Built
1974
Reconstructed
2007
Length
24.9 m (81.7 ft)
Max Span
6.1 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
9,628
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.