ENTRANCE ROAD over MORRISON CREEK

NAVY RESEARCH CENTER · County 031, California · Built 1965 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1CA2002
Year Built
1965
Length
24.9 m (81.7 ft)
Max Span
9.8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
150
Material
Concrete Continuous
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.