US 50-RAMP C12-EB over P STREET ONRAMP

03-SAC-005-22.62-SAC · County 067, California · Built 1971 · 2 Lanes · 21,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24 4312
Year Built
1971
Length
386.7 m (1268.7 ft)
Max Span
39.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
21,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.