US 50-RAMP A6-WB over Q ST OFFRAMP 3RD ST

03-SAC-050-L0.41-SAC · County 067, California · Built 1971 · 3 Lanes · 17,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24 4106
Year Built
1971
Length
311.8 m (1023 ft)
Max Span
45.7 m
Width
11.9 m (39 ft)
Lanes
3
Daily Traffic
17,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.