INTERSTATE 5 over SOUTH REACH BEACH LAKE
03-SAC-005-12.40 · County 067, California · Built 1975 · 9 Lanes · 93,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
38.4313, -121.488239
This bridge is in worse condition than 21% of bridges in County 067. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
LAGUNA BLVD over INTERSTATE 5
Built 1992
INTERSTATE 5 SB over BEACH LAKE
Built 1975
HARBOUR POINT DR over LAGUNA W DISCHARGE CHNL
Built 1980
DWIGHT ROAD over LAGUNA WEST CHANNEL
Built 2013
ELK GROVE BLVD over INTERSTATE 5
Built 1975
LAGUNA BLVD over UP RR AND BNSF RY
Built 2002
FREEPORT over SACRAMENTO RIVER
Built 1929
ELK GROVE BLVD over UP RR AND BNSF RY
Built 2002
COSUMNES RIV BLVD over INTERSTATE 5
Built 2015
COSUMNES RIVER BLV over MORRISON CREEK AND UPRR
Built 2015
Bridge Details
- Structure #
- 24 0347
- Year Built
- 1975
- Length
- 11.6 m (38.1 ft)
- Max Span
- 3.7 m
- Lanes
- 9
- Daily Traffic
- 93,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.