INTERSTATE 5 SB over BEACH LAKE
03-SAC-005-12.92 · County 067, California · Built 1975 · 3 Lanes · 46,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.438864, -121.490078
This bridge is in worse condition than 98% of bridges in County 067. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
INTERSTATE 5 over SOUTH REACH BEACH LAKE
Built 1975
LAGUNA BLVD over INTERSTATE 5
Built 1992
HARBOUR POINT DR over LAGUNA W DISCHARGE CHNL
Built 1980
FREEPORT over SACRAMENTO RIVER
Built 1929
DWIGHT ROAD over LAGUNA WEST CHANNEL
Built 2013
COSUMNES RIV BLVD over INTERSTATE 5
Built 2015
LAGUNA BLVD over UP RR AND BNSF RY
Built 2002
ELK GROVE BLVD over INTERSTATE 5
Built 1975
COSUMNES RIVER BLV over MORRISON CREEK AND UPRR
Built 2015
FRANKLIN BLVD over LAGUNA CREEK
Built 1992
Bridge Details
- Structure #
- 24 0262
- Year Built
- 1975
- Reconstructed
- 1996
- Length
- 175.9 m (577.1 ft)
- Max Span
- 13.7 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 3
- Daily Traffic
- 46,500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,184,000
- Total Project Cost
- $5,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.