INTERSTATE 80EB over RIO LINDA BLVD

03-SAC-080-M6.60-SAC · County 067, California · Built 1970 · 8 Lanes · 170,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24 0203
Year Built
1970
Reconstructed
2013
Length
66.4 m (217.8 ft)
Max Span
23.5 m
Width
45.1 m (148 ft)
Lanes
8
Daily Traffic
170,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.