DRY CREEK ROAD over INTERSTATE 80

03-SAC-080-M7.13-SAC · County 067, California · Built 1970 · 4 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
24 0104
Year Built
1970
Length
59 m (193.6 ft)
Max Span
29.3 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
5,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.