UDELL ROAD over PUTAH SOUTH CANAL

0.1 MI E PADDON RD · County 095, California · Built 1956 · 2 Lanes · 423 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23C0171
Year Built
1956
Length
18.3 m (60 ft)
Max Span
8.8 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
423
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.