INTERSTATE 505 SB over SWEENEY CREEK

04-SOL-505-R5.20 · County 095, California · Built 1946 · 2 Lanes · 12,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23 0029L
Year Built
1946
Reconstructed
1995
Length
30.5 m (100.1 ft)
Max Span
8.5 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
12,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.