ESQUIVEL RD over PUTAH SOUTH CANAL
0.1 MI E PADDON RD · County 095, California · Built 1977 · 2 Lanes · 44 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.429436, -121.951733
This bridge is in worse condition than 12.6% of bridges in County 095. The average bridge in California is 0 years old; this one is 49 years old.
Nearby Bridges
PADDON ROAD over PUTAH SOUTH CANAL
Built 1955
UDELL ROAD over PUTAH SOUTH CANAL
Built 1956
ROBINSON RD over PUTAH SOUTH CANAL
Built 1977
MIDWAY ROAD over PUTAH SOUTH CANAL
Built 1955
INTERSTATE 505 NB over MIDWAY RD
Built 1974
INTERSTATE 505 SB over MIDWAY RD
Built 1974
TIMM ROAD over SWEENEY CREEK
Built 1981
INTERSTATE 505 over GIBSON CANYON CREEK
Built 1974
LEISURE TOWN RD over SWEENEY CREEK
Built 1974
HARTLEY RD over SWEENEY CREEK
Built 1957
Bridge Details
- Structure #
- 23C0121
- Year Built
- 1977
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.6 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 44
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.