ENGLISH HILLS RD over SWEENEY CREEK

.5 MI S PEACEFUL GLEN RD · County 095, California · Built 1993 · 2 Lanes · 500 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
23C0170
Year Built
1993
Length
14.3 m (46.9 ft)
Max Span
4.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.