DRY CREEK RD over DRY CREEK

2 MI W OF SR 29 · County 033, California · Built 2017 · 1 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
14C0128
Year Built
2017
Length
20.1 m (65.9 ft)
Max Span
20.1 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.