BIG CANYON RD over PUTAH CREEK
0.5 MI N OF SR 175 · County 033, California · Built 1961 · 2 Lanes · 820 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
38.76015, -122.61545
This bridge is in worse condition than 58% of bridges in County 033. The average bridge in California is 0 years old; this one is 65 years old.
Nearby Bridges
STATE ROUTE 29 over SAINT HELENA CREEK
Built 1934
WARDLAW ST over SAINT HELENA CREEK
Built 1908
STATE ROUTE 175 over DRY CREEK
Built 1952
STATE ROUTE 29 over LUPIYOMA CREEK
Built 1955
HARBIN SPRINGS RD over HARBIN CREEK
Built 2018
DRY CREEK RD over DRY CREEK
Built 2017
HARBIN SPRINGS RD over HARBIN CREEK
Built 1930
STATE ROUTE 175 over PUTAH CREEK
Built 1964
STATE ROUTE 29 over PUTAH CREEK
Built 2003
STATE ROUTE 175 over PUTAH CREEK
Built 1994
Bridge Details
- Structure #
- 14C0010
- Year Built
- 1961
- Length
- 80.7 m (264.8 ft)
- Max Span
- 17.7 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 820
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.