STATE ROUTE 175 over DRY CREEK

01-LAK-175-27.48 · County 033, California · Built 1952 · 2 Lanes · 3,150 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
14 0020
Year Built
1952
Length
33.8 m (110.9 ft)
Max Span
4.3 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
3,150
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.