INTERSTATE 5 NB over COTTONWOOD CREEK

02-SIS-005-R63.65R · County 093, California · Built 1974 · 2 Lanes · 15,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
02 0175R
Year Built
1974
Length
53 m (173.9 ft)
Max Span
26.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
15,300
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.