INTERSTATE 5 SB over HENLEY WAY

02-SIS-005-R61.55 · County 093, California · Built 1974 · 2 Lanes · 7,650 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
02 0174L
Year Built
1974
Length
29.9 m (98.1 ft)
Max Span
29.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,650
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.