AGER RD over KLAMATH RIVER CORP RR
S OF COPCO RD · County 093, California · Built 1976 · 2 Lanes · 617 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.898992, -122.508611
This bridge is in worse condition than 7.8% of bridges in County 093. The average bridge in California is 0 years old; this one is 50 years old.
Nearby Bridges
DENNIS LANE over WILLOW CREEK
Built 1969
COPCO ROAD over COTTONWOOD CREEK
Built 1980
HENLEY-HORNBROK RD over COTTONWOOD CREEK
Built 1989
COPCO RD over DRY CREEK
Built 1960
FRONT ST over COTTONWOOD CREEK
Built 2006
INTERSTATE 5 NB over HENLEY WAY
Built 1974
INTERSTATE 5 SB over HENLEY WAY
Built 1974
AGER-BESWICH RD over WILLOW CREEK
Built 1968
DITCH CREEK ROAD over INTERSTATE 5
Built 1974
COTTONWOOD CR RD over DITCH CREEK
Built 1968
Bridge Details
- Structure #
- 02C0029
- Year Built
- 1976
- Length
- 113.6 m (372.7 ft)
- Max Span
- 44.5 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 617
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.