BAILEY HILL RD over HUTTON CREEK

0.75 MI S/O RTE 5 · County 093, California · Built 1915 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
02C0040
Year Built
1915
Reconstructed
1924
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.