US 63-03- LM 11.06 over BRUSHY CREEK
11.06 MI SE SHARP CO LINE · County 075, Arkansas · Built 1929 · 2 Lanes · 6,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.138058, -91.158214
This bridge is in worse condition than 31.5% of bridges in County 075. The average bridge in Arkansas is 0 years old; this one is 97 years old.
Nearby Bridges
US 63-03- LM 11.21 over CREEK
Built 1929
CR 219 - H over CREEK
Built 1993
US 63-03-LM 12.47 over STENNIT CREEK
Built 1953
US 63-03- LM 9.11 over Clear/Chaplin Crk
Built 1929
US 63-03- LM 8.26 over Lawson Creek
Built 1929
SH117-03-LM0.22 over FALL CREEK
Built 1929
SH 117-02- LM 8.63 over DIVENA BR
Built 1964
SH 361-03- LM 0.00 over SPRING RIVER
Built 1992
SH 117-02- LM 7.29 over DENTON CREEK BRANCH
Built 1964
US 63-03- LM 7.17 over HARDING CREEK
Built 1929
Bridge Details
- Structure #
- 0000000000A0653
- Year Built
- 1929
- Reconstructed
- 1954
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.4 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 6,100
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.