US 63-03- LM 9.11 over Clear/Chaplin Crk

9.08 MI SE SHARP CO LINE · County 075, Arkansas · Built 1929 · 2 Lanes · 6,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000000A0652
Year Built
1929
Reconstructed
1954
Length
15.2 m (49.9 ft)
Max Span
7.6 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
6,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.