BUTLER ROAD over HUACHUCA CREEK

425 W 0F CHRISTY AVE · County 003, Arizona · Built 1930 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
DAPTRAHUA000004
Year Built
1930
Length
8.4 m (27.6 ft)
Max Span
4 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
300
Material
Concrete Continuous
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$10,000
Total Project Cost
$11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.