HUNT ST over STORM DRAINAGE

BTN ALLEN & HATFIELD ST · County 003, Arizona · Built 1991 · 4 Lanes · 1,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
DAPTRAHUA03399
Year Built
1991
Length
9.7 m (31.8 ft)
Max Span
3 m
Width
30.8 m (101 ft)
Lanes
4
Daily Traffic
1,000
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$34,000
Total Project Cost
$46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.