Ramp SE (SR143) over I-10

Junct SR143 and I10 · County 013, Arizona · Built 2023 · 2 Lanes · 97,065 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20234
Year Built
2023
Length
272.2 m (893 ft)
Max Span
54.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
97,065
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.