SR 143 over Tempe Drain #2

RT143 MP 0.4 · County 013, Arizona · Built 2023 · 2 Lanes · 42,278 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20220
Year Built
2023
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
42,278
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.