Combine Ramp SW/EN over SR 189 WB
At junc of I-19 & SR189 · County 023, Arizona · Built 2021 · 2 Lanes · 4,088 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.3636, -110.9492
This bridge is in worse condition than 48.2% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 5 years old.
Nearby Bridges
SR 189 Ramp SW over Mariposa Canyon Wash
Built 2021
Ramp EN over I-19
Built 2021
SR 189 over Mariposa Canyon
Built 1977
I 19; SB over SR 189; Mariposa Rd
Built 1996
I 19; NB over SR 189; Mariposa Rd
Built 1996
SR 189 over Wash
Built 1976
I 19; SB over Frank Reed Rd
Built 1969
I 19; NB over Frank Reed Rd
Built 1969
SR 189 over Mariposa Canyon
Built 1976
SB 19; FAP 001 over Mariposa Canyon
Built 1968
Bridge Details
- Structure #
- 20233
- Year Built
- 2021
- Length
- 258.5 m (848.1 ft)
- Max Span
- 50.3 m
- Width
- 18.7 m (61.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,088
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.