SB 19; FAP 001 over Mariposa Canyon

1.3 mi N Jct SR 82 · County 023, Arizona · Built 1968 · 4 Lanes · 18,989 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00324
Year Built
1968
Reconstructed
2006
Length
39.3 m (128.9 ft)
Max Span
10.7 m
Width
24.3 m (79.7 ft)
Lanes
4
Daily Traffic
18,989
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.