SR 303L over Indian School Road

2.3 mi N of I-10 · County 013, Arizona · Built 2013 · 6 Lanes · 44,106 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20016
Year Built
2013
Length
69.8 m (229 ft)
Max Span
34.1 m
Width
59.9 m (196.5 ft)
Lanes
6
Daily Traffic
44,106
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.