PebbleCreek Pkwy over Drainage Channel
Pebble Crk and Ind Sch Rd · County 013, Arizona · Built 2006 · 6 Lanes · 1,010 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.494, -112.4011
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 20 years old.
Nearby Bridges
Sarival Avenue over Drainage Channel
Built 2006
Sarival Ave over Drainage Channel
Built 2004
Indian School Rd over Wash
Built 1997
Indian School Rd over Drainage Channel
Built 1994
SR 303L over Indian School Road
Built 2013
N 152nd Ave over Drainage Channel
Built 2004
SR 303L NB over Camelback Road
Built 2013
Camelback Rd over Bullard Wash
Built 2005
Thomas Road over 303L NB & SB
Built 2014
Pebble Creek Pkwy over RID Canal
Built 1983
Bridge Details
- Structure #
- 11476
- Year Built
- 2006
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 6
- Daily Traffic
- 1,010
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.