SR303L over Peoria Ave
8 miles N of I-10 · County 013, Arizona · Built 2013 · 3 Lanes · 25,779 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.5804, -112.418
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 13 years old.
Nearby Bridges
SR303L over Peoria Ave
Built 2013
SR303L over Olive Avenue
Built 2013
303L NB over Cactus Rd
Built 2014
303L SB over Cactus Road
Built 2014
SR303L over Olive Ave/BNSF RR
Built 2013
SR303L over Olive Ave/BNSF RR
Built 2013
Granite Vista Loop over Wash
Built 2019
SR 303L over Northern Parkway
Built 2013
SR303L over Northern Parkway
Built 2013
Citrus Road over Wash
Built 1999
Bridge Details
- Structure #
- 20013
- Year Built
- 2013
- Length
- 71 m (232.9 ft)
- Max Span
- 36 m
- Width
- 30 m (98.4 ft)
- Lanes
- 3
- Daily Traffic
- 25,779
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.